infrastructure
Culver Drive, Bryan Avenue, Irvine Boulevard, Market Place 1999-2000
Under heavy traffic conditions, we improved over 1.5 million square feet of roadway, including 40,000 linear feet of curb and gutter, as well as numerous bus bays and sidewalks. Our crews also constructed an extensive storm drain, sewer and water system that required dewatering due to the high water table. We installed wide-diameter storm drain pipe in addition to a 24-inch steel water line. Our bridge division constructed a bridge to connect the nearby industrial development to the community’s new retail center. We also installed the industrial development’s dry utility package, placing the phone and electrical systems underground and completing electrical-system improvements at seven intersections.
 