| The
purpose of this project is to continue work on
the City of Mojave storm drain system through
this multi-phase project. The project includes
the installation of over 5000 feet of reinforced
concrete pipe from 48 inch diameter main lines
to 18 inch diameter laterals. The depth of the
storm drain varies from 16 feet at the deepest
point to 6 feet. This is a much needed addition
to these unimproved areas of the city. |
|
 |
|