infrastructure
Mojave storm drain project
The purpose of this project is to continue work on the City of Mojave storm drain system through this multi-phase project. The project includes the installation of over 5000 feet of reinforced concrete pipe from 48 inch diameter main lines to 18 inch diameter laterals. The depth of the storm drain varies from 16 feet at the deepest point to 6 feet. This is a much needed addition to these unimproved areas of the city.
 

image 1 of 5

  1 2 3 4 5