| Griffith
Company has been working on storm drain and domestic
water improvements for the Port of Long Beach’s
Pier T Wharf Extension Project. Griffith Company has
recently completed the final storm drain connection
to the ocean, including the demolition of an existing
6’ thick concrete Seawall for the installation
of a 42” outfall to the harbor. The domestic
water improvements consist of a 12” backbone
that is connected to the Port of Long Beach backlands
water system. The storm drain improvements consist
of reinforced concrete pipe, high-density polyethylene
pipe and case in place concrete structures. |
|